- Development of a 492,410 square foot industrial warehouse building with associated paving, screening, landscaping, lighting, and drainage improvements on 20.99 acres of land.
Location
- The northwest corner of Valley Boulevard and Willow Avenue (APNs: 0132-181-01, 0132-201-03, 0254-261-14 & -17).
Project Planner
- Daniel Casey, Senior Planner
Related Documents
Request
- Add a new Light Industrial land use designation to Planning Areas 1, 2, and 3 of the Pepper Avenue Specific Plan and create Planning Area 10 to facilitate a maximum building of up to 735,185 square feet of industrial uses and up to 13,000 square feet of commercial retails uses across Planning Areas 1, 2, 3, and 10. Additionally, the project entails the development of one (1) approximately 485,000 square foot industrial warehouse building with associated paving, screening, landscaping, lighting, and drainage improvements on a 23.83 acre site that comprises Planning Areas 2 and 3 of the Pepper Avenue Specific Plan.
Location
- The southeast corner of Pepper Avenue and SR-210 Freeway.
Project Planner
- Daniel Casey, Senior Planner
Related Documents
Description
The City of Rialto (City) proposes to construct bicycle and pedestrian trail improvements along the west side of Cactus Avenue between Rialto Avenue and Base Line Road, in general accordance with the City's Circulation Element of the General Plan. The bicycle and pedestrian trail improvements will include a concrete path, signage, and landscaping. Right-of-way is existing for the proposed trail; the right-of-way exists within the street dedicated right-of-way and Common Use Agreements with the San Bernardino County Flood Control and Water Conservation District.
Location
- Existing public right-of-way along the west side of Cactus Avenue between Rialto Avenue and Base Line Road
Project Planner
- Daniel Casey, Senior Planner
Related Documents
Request
- 80,000 square foot Retail/Commercial Center
Location
- North-East corner of Ayala Drive and Renaissance Parkway (Renaissance Specific Plan)
Project Planner
- Paul Gonzales
Related Documents
- Appendix A: Mitigation Monitoring and Reporting Program (PDF)
- Appendix B: Air Quality Technical Report (PDF)
- Appendix C: Biotic Resources Report (PDF)
- Appendix D: Paleontological Resource Assessment Report (PDF)
- Appendix E: Phase I Environmental Site Assessment (PDF)
- Appendix F: Preliminary Drainage Report and Water Quality Management Report (PDF)
- Appendix G: Noise and Vibration Impact Assessment Technical Report (PDF)
- Appendix H: Traffic Impact Study (PDF)
- Renaissance East Addendum to the Specific Plan (PDF)
Request
- Modification and reestablishment of an existing biosolids energy plant
Location
- 503 E Santa Ana Avenue
Project Planner
- Daniel Casey, Senior Planner
Related Documents
Request
Development of a 430,581 square foot industrial storage warehouse building and a 249,026 square foot industrial storage warehouse building on 31.08 acres of land.
Location
- The north side of Baseline Road approximately 350 feet east of Fitzgerald Avenue
Project Planner
- Daniel Casey, Senior Planner
Related Documents
Olive Avenue Development Project – Notice of Availability
Olive Avenue Development Project – Draft Environmental Impact Report Appendices
Olive Avenue Development Project – Draft Environmental Impact Report